Welcome to Dale's Blog

Aged Care – Challenger Place, Melville (Braemar)

Posted in Projects Completed

Dale Alcock Projects was engaged by Braemar Presbyterian Care to construct four Independent Living Units as part of an aged care facility on Challenger Place, Melville.

Apartments – Mill St, Cannington (Mode)

Posted in Projects Completed

Dale Alcock Projects worked with Fini Group to construct this low-rise medium density development of 15 townhouses and 5 apartments, which was designed as a an 'alternative to high-rise apartments'.

Apartments – Lealt St, Ardross

Posted in Projects Completed

Delivery of a medium density project on Lealt Street in Ardross. This completed apartment project showcases the construction of two 2 storey townhouses and 8 two-bedroom apartments.

Terraced Housing – Coogee: Stage 1 (Driftwood)

Posted in Projects Completed

The collaboration between Dale Alcock Projects, Webb Brown-Neaves and Yolk Property Group saw the successful delivery of 21 two and three level terrace, premium quality townhouses in Port Coogee.

Terraced Housing – Coogee: Stage 2 (Driftwood)

Posted in Projects Completed

The second stage of a project in collaboration with Webb and Brown Neaves and Yolk Property Group. This is the second stage of Driftwood which includes 7 new terraced houses.

NDIS – Specialist Disability Accommodation (Rocky Bay)

Posted in Projects Completed

Rocky Bay’s first Specialist Disability Accommodation (SDA) project, a duplex project to cater for 6 residents was completed within a 5 month construction program.

Childcare Centre – Albany Hwy, Kelmscott

Posted in Projects Completed

The delivery of a 110-place childcare centre engaged by Mandalay Capital under a Design and Construct contract. The centre was built from a lightweight timber framed system.

Apartments – Fulham St, Cloverdale

Posted in Projects Completed

Dale Alcock Projects delivered 16 apartments over three levels for a private client in Jan 2020