Thinking about a demo and build?

Rebuild your home. Reimagine your future.

Dreaming of a new home? By demolishing your current house and rebuilding a beautiful Dale Alcock home, you’ll get to stay in the neighbourhood you love while avoiding all the hassles and costs of moving, from home opens, to stamp duty and all in between.

Get in touch to discuss your demo and build options

Your details

By submitting this form, you acknowledge that you have signed up for updates, have read the Privacy and Data Collection Statement and that you consent to the use and disclosure of your personal information set out in that statement.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

This is an error message
Thank You!

The knock down rebuild process

At Dale Alcock Homes, we have the design, planning and construction expertise to help you through the whole journey.

✔ We can recommend our preferred demolition contractors that you engage with for your demo

✔ Stylish Single Storey and Two Storey designs, with our huge range of stylish inclusions that come as standard.

✔ 25 year Structural Warranty and 12 Month Service Warranty for complete peace of mind.

Home demolition process & costs

To help you get a feel for the process and costs involved with a demolish and build in Perth, we’ve put together a handy timeline with key milestones along the journey.

The Demolition Process

✔ Work with a New Homes Consultant on design and pricing

✔ Once design and PWC is finalised, you will move into Pre-construction

✔ HIA building contract is signed

✔ We can facilitate an external quote with our preferred contractors for demolition.The cost of a demolition here in Perth is usually around $20,000 – $30,000 depending on what can be salvaged and the requirements.

 

✔ We recommend getting unconditional finance approval before proceeding with demolition (unless cash funded buyer). Keep your New Homes Consultant updated throughout this process.

✔ Client to liaise with their demolition contractor and book in their house to be demolished.

✔ We will be there every step of the way to support your Pre-construction journey

✔ Client to organise roll back of NBN and consult with demolition contractor on all required approvals.

✔ House demolished!

✔ We will conduct a post demolition inspection or additional survey if required to assess any construction requirements

✔ Block levelled ready for construction.

Demolish and Build FAQS

The standard demolition cost in Perth, WA, ranges between $20,000 to $30,000 depending on your demolition requirements and items you want salvaged.

Once the house is vacant, the demolition process can take 6-12 weeks. The demolition itself only takes a couple of days. This will be entirely managed by your demolition contractor however, your Dale Alcock Homes Customer Experience Coordinator will check in with you throughout the process.

You will need to vacate the home about 6-7 weeks before the actual demolition of the house. So, if you need to organise termination of tenant occupancy and rental accommodation, you should start planning it about eight weeks out. For more accurate timings, liaise with your demolition contractor. Be sure to also chat to your neighbours to make them aware of your demo intentions and give them a broad outline of your building program.

The disconnection of services and abolishment of meters will be arranged by you or your demolition contractor. You will need to notify Synergy (131 353) and Atco Gas (131 356) by phone approximately 7 days prior to vacating the home so the final meter reading can be done. If there is NBN on your premises, you will also need to arrange for an electrical contractor to roll it back after you have vacated the home.

During your demolish and build process you may wish to retain some items on your Perth property such as trees, bores, and retaining walls. Raise this with your demolition contractor early on so they know what needs to stay.

Items such as cooktops, ovens, hot water units, air conditioners, cupboards, bathroom fixtures and fittings, lights, tapware and floorboards can all be salvaged – you can remove these items yourself or your demolition contractor can remove them for you (usually at a cost). This does not include some structural items, so it’s best to discuss what items you want to keep before they start the demolition process.

If there is no existing power dome, we will arrange the ordering and installation of the dome once the site has been pegged by the surveyor following the demolition being completed. The demolition contractor will identify the sewer junction with a marker when they disconnect the old service. Overhead power will also be disconnected by the demolition contractor (if applicable).

It will all depend on the Residential Planning Codes (R-Codes) of the area, and specifically your block. As R-Code specialists, we can consult with local councils and planning consultants on your behalf to work out what’s possible on your site and whether it will be impacted by future zoning changes. Our expert Development Consultants can tell you what your R-Code is and then what that means for you.

There is quite a bit of time that can go into demolishing your house. These are a few things that can impact the timings of your demolition.

  • Rat bating is required on every demolition job and can take up to two weeks.
  • If asbestos is found on your property (usually in houses built prior to 1990) then this can make a demolition take longer.
  • Be sure to engage with your tenants early on in the process as this can delay the demolition of your home.
  • If you have shared boundaries, you will require consent from your neighbours to proceed with your demo and rebuild.

Looking to demolish and develop in Perth?

Looking to unlock the true potential of you block? If space allows, you could potentially subdivide and build multiple units. Let us take care of every aspect of your development to minimise your risk and maximise your return.

VIEW DEVELOPMENTS